Current repairs of “Hristo Botev” Blvd. (south lane) – from the beginning of “Betonov most” bridge from t”Macedonia” Blvd. to “Nikola Vaptsarov” Blvd., Plovdiv”. The total cost of the contract is 832,734.99 BGN without VAT. It was completed in October 2014