SECOND STAGE OF ”TRANSIT ROADS V”, LOT №9
Rehabilitation and reconstruction of Road II-64 Banya- “Trakia” highway from km 35 + 947 to km 49 + 338, Subsection from km 35+ 947 to km 49 + 369 including Pedestrian subways in the town of Banya at km 10 + 790 at the total cost of 7,609.651 BGN without VAT. The total length of the section is 13.391 km and was completed on 31.08.2010.