Repair of the 3.5 km section, which has been cleared, the gauge has been opened, and the rock mass has been removed and transported away. The old gutters have been drained and cleaned, and new ones have been installed in some places.
Technological milling and local repairs have been carried out on the pavement where it lacked the necessary load-bearing capacity.